This vaulted arch bridge in Magdeburg, Germany was completed in 1882. In 2016 a drone operator reproduced it in 3D in less than 2 hours.
Method
1. Quick and safe data acquisition by drone operator with zero traffic interference.
2. 3D reconstruction including decorative elements, true to scale.
3. Accuracy <.5mm, 40 images, 34 million points (point cloud).
Result
Precise construction plans for damage detection, documentation and deformation monitoring of the bridge.
Drone used
The AscTec Falcon 8. German made, designed for commercial inspection work Specs
Get some quotes for a drone operator
✔ 100% free service✔ Featured in the SMH, The Age & WA Today
✔ 1,800+ online recommendations
